We all build RAC infrastructure and we have seen many cases that environment is not stable after live or when start using it.
The reasons may be many, but due to vast technologies involvement in high availability concepts we do not know or we ignore many aspects while doing environment testing.
It is indeed very important, We need to do end to end test cases with regards to failovers as the high availability infrastructure is meant for that. Zero failure tolerance, or Connection failover or what ever the case this test cases should be structured, well organized so that our high availability solution to business critical systems should be fool proof.
Have collected the RAC failover test cases from various sources and modified a bit , attached here in with categorical wise which may be useful to you all when some one ask you about to do testing of RAC new environment.
This documents contains,
Category of testing
Action & Target we are testing
Steps to carry out testing
Expected result of testing
Test result to record
Category | Test Cases | Document | Remarks |
Clusterware Testing |
Private Network Cable FailuresPublic Network Cable Failures
RAC Host Failures Oracle HA Features Vendor HA Features 11gR2 New Features testing (OCR/Voting/HAIP etc) |
Download here | |
Storage | RAC Host-to-Storage Cable FailuresRAC Host-to-Storage NIC/HBA Failures
Storage Rack/Enclosure Failures Oracle File Corruption or I/O Fencing Scenarios NAS/SAN Storage Administrative Tasks
|
Download here | |
Stress | Run heavy database load | Download here | |
ASM | Kill ASM InstanceFail ASM Disks
Reboot node while adding one ASM Disk Destroy One failgroup while in normal redundancy |
Download here | |
ACFS | Kill VDBG ProcessPhysically fail one of the ASM failure diskgroups
Resize ACFS disks by acfsutil |
Download here |